15000 SE Eastgate Way

March 1, 2019: Michaels Subaru . Storm damage from recent winter storm.

From: Marsh, Christopher
Sent: Friday, March 01, 2019 11:42 AM
To: Heitz, Chuck <CHeitz@bellevuewa.gov>
Subject: FW: Subaru

Per Lt. Kris Johnson


• VW/Subaru did sustain significant damage due to the snowstorm, including:
o Overpass connecting VW to their shop collapsed (has since been removed but wires span the buildings - I believe they are CAT5 per manager)
o Cracked overhang on the south end of the VW (pic below)
¿ As you can see, this is held by two 6x6’s but they are not properly secured or pinned
¿ They are not using the entire surface area of the 6x6
¿ They are not plumb and were sledgehammered in and reside at a slight angle
¿ Lt. Marsh will follow up today with the building department since we discovered this late last night
o The manager did say they had a structural engineer walk the entire buildings and they didn’t see any other compromised components
¿ That said, it’s a good reminder that that any flat roof in our first-in might have some damage we/they aren’t aware of
(consider that VW/Subaru wouldn’t have had a building engineer check it out if it wasn’t for the collapse and settling of the overhang)

March 1, 2019: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.