15000 SE Eastgate Way
March 1, 2019:
Michaels Subaru . Storm damage from recent winter storm.
From: Marsh, Christopher
Sent: Friday, March 01, 2019 11:42 AM
To: Heitz, Chuck <CHeitz@bellevuewa.gov>
Subject: FW: Subaru
Per Lt. Kris Johnson
• VW/Subaru did sustain significant damage due to the snowstorm, including:
o Overpass connecting VW to their shop collapsed (has since been removed but wires span the buildings - I believe they are CAT5 per manager)
o Cracked overhang on the south end of the VW (pic below)
¿ As you can see, this is held by two 6x6’s but they are not properly secured or pinned
¿ They are not using the entire surface area of the 6x6
¿ They are not plumb and were sledgehammered in and reside at a slight angle
¿ Lt. Marsh will follow up today with the building department since we discovered this late last night
o The manager did say they had a structural engineer walk the entire buildings and they didn’t see any other compromised components
¿ That said, it’s a good reminder that that any flat roof in our first-in might have some damage we/they aren’t aware of
(consider that VW/Subaru wouldn’t have had a building engineer check it out if it wasn’t for the collapse and settling of the overhang)
March 1, 2019: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.