March 8, 2019: SEA I-405/520 - Verizon. On the existing 67-ft Puget Sound Energy wooden utility pole at 33-ft tip height, remove (9) of the existing (10) panel antennas and add (6) new panel antennas for a new (reduced) total of (7), remove (8) diplexers, remove (1) Bias-T unit, add (6) triplexers, and add (1) 6-in conduit to hold (2) new coaxial cable runs. There is no increase in the overall structure height, and no increase in antenna tip height. Inside the existing equipment building at grade, remove (14) diplexers and replace with (6) triplexers, remove (11) remote radio heads and replace with (6) remote radio heads, remove (4) internal radios from an existing cabinet, and remove (1) Bias-T. There are no proposed changes to the ground equipment footprint, and there is no proposed ground disturbance.
June 18, 2019: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.