14008 NE 8th St
April 12, 2019: Sprint CLW MW-to-Lit - SE52XC077. Install new H-frame. Install new ground buss bar. Install power and grounding to the new the buss bar to the new NID, Conduit from the new power J-box to the ground bar on the new H-frame. Install 17 of new conduit from fiber J-box to existing clearwire cabinet. Install 17 of fiber and power through through new conduit. Install new conduits from the new NID to the new J-boxes on the H-frame. Install 2 new J-boxes and interconnect conduits between J-boxes on H-frame. Install 28' of new conduit from new fiber J-box to proposed MMP location.
April 26, 2019: Canceled.