Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

372 W Lake Sammamish Pkwy NE

Oct. 11, 2019: Steinmetz dock repair. Replace worn elements on existing residential dock on Lake Sammamish. Framing to be replaced in kind/same location with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Pilings to be sleeved with HDPE tubes if/as needed as shown on attached plans. All work to be done in existing footprint. No pilings to be added, removed or replaced. No land disturbance or fill proposed.

March 24, 2021: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.