2177 Killarney Way

Jan. 21, 2020: Schlotfeldt pier repair and platform lift installa. Repair existing 706 SF pier. Remove existing covered moorage (520 SF). Repair piles as needed by sleeving with HDPE pipe and filling with concrete. Repair caps and stringers. Replace solid wood-plank decking with Titan grated decking. Intermediate stringers will be added to support the new grated decking. Install a freestanding fully grated platform lift. Install a translucent canopy (360 SF) on the existing freestanding boatlift.

April 16, 2020: Completed.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.