Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

100 112th Ave NE

Jan. 30, 2020: BelleVista Place. This proposal is for a multi-phase, full-block development on the site bounded by 112th Ave NE, NE 2nd, 114th Ave NE and Main Street in downtown Bellevue. The project is a two-phase Master Development Plan (MDP).

The Phase 1 development will be a 17-story Class-A office building, a 5-story for-rent residential building, both over 5 levels of below grade parking. There will be 377,507 GFA of office and 123,019 SF of residential, combined with ground floor uses consisting of 16,435 SF of retail. The northern portion of the site will be dedicated to an enhanced through-block connector along the east-west axis of the site, connecting 112th Ave NE to 114th Ave NE. 

The Phase 2 development will be a 17-story Class-A office building and a 15-story Class-A office building with 5 levels of below grade parking that will connect to Phase 1. In total, there will be 609,633 GFA of office, combined with ground floor uses consisting of 17,923 SF of retail.

May 26, 2021: Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.