Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

1035 116th Ave NE

Feb. 28, 2020: Behavioral Health Unit (BHU) Project. The proposed project is a partial remodel of the 6th floor of the West Parking Garage (WPG). The existing open-air, above-ground garage was initially constructed in the mid-1980s. The 6th floor was added and built out as an I-2 childbirth center and has operated as such until now. The proposed project will convert part of the floor into a voluntary-admission inpatient behavioral health unit. The balance of the floor will be minimally changed so it can function as a separate med/surg inpatient unit. This project is part of the multi-phase Project FutureCare on campus. 
Level 6 is approximately 32,800 sf in size. This area will be split into a new 14-bed Behavioral Health unit (approx.12,000 sf) and a minimally remodeled 27-bed Reserve unit (approx. 21,000 sf). The Reserve unit consists of single-occupant patient rooms that were formerly post-partum rooms. The floor will remain I-2 occupancy.

July 13, 2020: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.