1450 W Lake Sammamish Pkwy NE
March 6, 2020: Rowe dock repair. Replace worn elements on existing residential dock on Lake Sammamish. Wooden decking to be replaced in kind/same location with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Pilings to be sleeved if/as needed with HDPE tubes as shown on attached plans.
April 20, 2020: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.