348 W Lake Sammamish Pkwy NE

March 16, 2020: Post dock repair. Replace worn elements on existing residential dock on Lake Sammamish. Dock framing to be replaced in kind/same location with ACZA treated fir beams - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Pilings to be sleeved with HDPE tubes as shown on attached plans.

July 13, 2020: Completed.