434 W Lake Sammamish Pkwy SE

March 16, 2020: Dunkle dock repair. Replace worn elements on existing residential dock on Lake Sammamish. Replacement framing to be ACZA treated fir, stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be ThruFlow grated panels. Pilings to be sleeved if/as needed with HDPE tubes as shown on attached plans. All work to be done in existing dock footprint.

March 4, 2022: Completed.