9553 Lake Washington Blvd NE
June 22, 2020: Meydenbauer Hill Pier & Beach Cove. Remove an existing pier (684 square feet) and demolish and existing boat cover (287 square feet). Construct a new pier (575 square feet). Install a new grated platform lift (144 square feet) and a new boat lift. Install two mooring piles. The new pier will be decked with ThruFlow grated decking with 42% open space. Remove a section of the existing bulkhead (28.6 lineal feet) to create a beach cove. Install 40 cubic yards of beach gravel in the cove. Plant native vegetation per the planting plan.
Dec. 9, 2021: Completed.