16910 NE 24th St
July 1, 2020: NE 24th St at 172nd Ave NE Slope Stabilization. This project will construct a soldier pile wall to stabilize the existing slope on the north side of NE 24th Street between 171st Avenue NE and 172nd Avenue NE. The work to be performed under this contract includes but is not limited to, traffic control; roadway excavation; removing existing pavement, curb and gutter, fence and guardrail; constructing storm drain pipes including storm structures, cement concrete curb and gutter, sidewalk, curb ramps, asphalt pavement, traffic barrier with pedestrian railing, guardrail and soldier pile wall with tiebacks; environmentally sensitive area buffer impact mitigation planting and restoration; grind and overlay of pavement; channelization and signing; and property restoration.
Dec. 18, 2020: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.