July 28, 2020: Bellefield 8 Parking Lot Repair. The owner is considering a more permanent solution for the parking lot maintenance. The parking is constructed over a deep layer of organic material that is continuously settling. In 1996, the previous property owner did a partial parking lot repair using rigid form blocking. Areas where rigid foam blocking was installed show a significantly slower settlement rate, except along the Mercer Slough edge. The owner would like to obtain information about permitting and timing for a parking lot repair that includes: - Removal of the existing paved surface and subgrade - Installation of light weight fill or rigid foam subgrade material - Installation of new pavement for the entire parking lot
July 28, 2020: Canceled.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.