July 28, 2020: Bellefield 8 Parking Lot Repair. The owner is considering a more permanent solution for the parking lot maintenance. The parking is constructed over a deep layer of organic material that is continuously settling. In 1996, the previous property owner did a partial parking lot repair using rigid form blocking. Areas where rigid foam blocking was installed show a significantly slower settlement rate, except along the Mercer Slough edge. The owner would like to obtain information about permitting and timing for a parking lot repair that includes:
- Removal of the existing paved surface and subgrade
- Installation of light weight fill or rigid foam subgrade material
- Installation of new pavement for the entire parking lot

July 28, 2020: Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.