550 106th Ave NE
Aug. 26, 2020: Unico Bellevue Connection. RENOVATED EXTERIOR FACADE FOR THE NORTH AND WEST SIDES, AND A PORTION OF THE SOUTH SIDE OF THE EXISTING BUILDING. EXISTING EXTERIOR WALKWAY AT MAIN ENTRY IS TO BE ENCLOSED. INTERIOR OPENINGS FROM THE DEMOLITION PERMIT 19-103285 BE WILL BE INFILLED WITH STRUCTURAL ASSEMBLIES, MANY OF WHICH ARE INCLUDED IN PERMIT 20 109777 BZ. EXTERIOR WALKWAYS ARE TO BE ENCLOSED. NEW LOBBY ENTRY WITH VESTIBULE, NEW LOBBY EXIT STAIRWAY, AND TWO ADDITIONAL ELEVATORS ARE TO BE ADDED WITH ACCESS AT GRADE (PLAZA).
Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.