9302 SE Shoreland Dr
Aug. 28, 2020: Neil dock repair. Replace worn elements on existing residential dock on Lake Washington. Dock framing to be replaced in kind/same location with ACZA treated fir beams - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Pilings to be sleeved with HDPE tubes as shown on attached plans. All work to be done in existing dock footprint.
June 1, 2021: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.