254 W Lake Sammamish Pkwy NE
Nov. 25, 2020: Lee pier repair and boatlift replacement. Repair piles as needed by sleeving with HDPE pipe and filling with concrete. The caps & stringers will be repaired and the solid wood-plank decking will be replaced with grated decking. The existing pier mounted PWC lift will be replaced with a freestanding PWC lift and the existing boatlift will be replaced and relocated from the boat slip to the south side of the pier.
Aug. 13, 2021: Completed.
View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Download design proposal PDF.
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.