Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

4628 125th Ave SE

Jan. 25, 2021: Filoteo Reasonable Use Exception. The proposed project involves the development of a modern single-family residence on a
residential parcel. The residence will be located in the southeastern corner of the parcel in order to avoid and maximize distance from on-site critical areas, including a wetland, stream, and steep slope. The proposed single-family residence will be three stories tall and will include a concrete driveway and a three-car garage. A small wooden deck is proposed on the northeastern side of the structure. Stormwater runoff from the new residence be directed to a dispersion trench with a flow path toward the on-site wetland, while the footing drains for the house will drain to the existing drainage ditch near the southern property boundary. Drainage from the driveway will be collected in a strip drain which will also flow to the drainage ditch after treatment. Unavoidable impacts to wetland and stream critical area buffers/setbacks will occur through site development. To compensate for these impacts, on-site mitigation is proposed.

July 28, 2021: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.