5805 Pleasure Point Ln
Jan. 29, 2021: Murray Dock Repair. The proposal is to replace the existing wooden framing and decking within the existing dock footprint. The replacement framing would be ACZA treated fir as shown on attached plans, while the replacement decking would be ThruFlow grated panels. Piles to be sleeved with HDPE tubes during the repair work as shown on attached plans.
March 9, 2021: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.