Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

2452 W Lake Sammamish Pkwy SE

March 29, 2021: Bucklin pier replacement/reconfiguration. Remove 159 SF of fixed walkway and 125 SF floating pier along with four (4) associated 4 inch steel support piles and one half Cu. Yd. of concrete shore bent. Install twelve (12) 6 inch diameter, two (2) 4 inch diameter and two (2) 2 inch diameter galvanized steed support piles via a vibratory pile driving system. Build a new 477 SF pier. The surface of the pier will be grated with Thru-Flow grated decking (43% open space). Install a freestanding boatlift with attached translucent canopy and a pier mounted PWC lift.

Oct. 21, 2021: Permits issued.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.