1212 104th Ave SE

April 16, 2021: T Mobile SE00478B Bellevue Church RELO North. On the rooftop of an existing church building and inside an existing stealth antenna enclosure remove and replace antennas reducing the total number of antennas from the current (9) to a new total of (7) antennas. The antennas to be located behind RF transparent antenna screening the same color as the stealth antenna enclosure and modified in size if needed to accommodate replacement antennas. Associated remote units and cables to be upgraded all behind the existing rooftop stealth enclosure. The ground based equipment cabinets are not visible from off of the property or street and located inside an existing building. The (3) existing cabinets shall be removed with (2) cabinets and other ancillary equipment to be upgraded adjacent to the equipment cabinets.

May 4, 2021: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.