Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

1745 114th Ave SE

May 6, 2021: Mercer Pointe Parking Lot Repair. The project proposes routine maintenance of the a parking lot at the Bellefield Office Park. Given the continuous settlement of the parking lot (1/2 to 1 inch per year), the pavement must be raised to its original condition. The parking lot area spans approximately 1.27 acres and will only consist of in-kind restoration. Construction will include removal of the existing asphalt pavement layer, the addition of lightweight fill to restore the grades, followed by typical pavement sections. The property is located in the Mercer Slough drainage basin and is surrounded by Type II wetlands. Construction activity will be limited to the parking lot area and there will be no encroachment into the wetlands. Existing stormwater drains into the wetlands and the Mercer Slough which is conveyed into Lake Washington. This path will be maintained.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.