Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

14230 NE Bellevue-Redmond Rd

May 10, 2021: OVERLAKE. The scope of work is to modify the existing WCF with 12 existing antennas are located behind a screen wall. There will be no additional height proposed. There will be 4 additional antennas proposed that will be placed on the existing antenna mounts and behind the antenna screen. There are 2 antennas that will require a cut out window due to the technology not being able to penetrate through the antenna screen. The two antennas will have a 3M film to cover the antenna and be painted to match the existing exterior color. The proposed modification will not substantially change the physical dimensions of the base station and all antennas are located behind the existing screen and attached to the existing antenna mounts.

May 18, 2021: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.