5443 Pleasure Point Ln

May 17, 2021: Dock Extension & Dredging. Add 30' of dock to the existing 61 feet, enabling the boat on the southern side of the dock to move further away from the shore, thus preventing damage to the boat from the shallow bottom and shading of the eelgrass. Remove two to four cubic yards of gravel migrated by a boat's pod drive that has created a shallow area closer to shore, which has caused damage to the boat's stem and rendered the permitted boat lift unusable. Move permitted boat lift five feet away from the shore to enable operation at low water.

Sept. 13, 2021: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.