Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

9665 Lake Washington Blvd NE

June 14, 2021: Accessory Structure and Lounge Addition. Proposed development is for a 125 square foot addition to an existing house, the removal of an existing accessory structure and construction of a new 810 square foot accessory structure. Also included in the scope of work are wood stairs and associated paving within the shoreline management area and designated ECA Steep Slope. The proposed work does not occur within the 25 feet of shoreline setback and limited disturbance to the steep slope is proposed, 105952 BR

March 16, 2023: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.