Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

1735 112th Ave NE

June 18, 2021: Raju Predevelopment Services Application. The project includes the demolition of an existing single-family residence and the construction of a single-family residence. Issues of concern to be discussed include; reduction of Steep Slope Setback, Stormwater Design and Required Setback from Drainage Ditch in back yard, relocation of Residential Driveway from joint driveway along south property line to new location along north property line. Confirm biologist report that the ditch is a drainage swale.

Aug. 10, 2021: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.