9620 SE 5th St
July 21, 2021: Whiting Residence/SE 5TH-BLVU. Primary res is currently under construction. Change lower floor designated "Guest Suite" area to a 700 SF ADU. ADU area is 7.68% of total combined ADU/primary res square footage (excl. garage area). ADU has separate entrance at rear of house and (1) off-site parking space (in addition to 2 required off-site parking spaces for primary res). Add (1) 24" electric range with (1) 24" ductless venting microwave oven above range in existing kitchenette area of proposed ADU. *DRAFT* of ADU Stmt of Use by Owner attached for COB review prior to signature/notarizing/recording. COB ADU Registr form is attached. Site Plan, Main Floor Plan showing revised SF calcs is attached. Lower Floor Plan showing ADU area is attached., 18 103409 BS
Sept. 1, 2021: Canceled.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.