Aug. 2, 2021: COBU 170th Place SE Pressure Improvements, CIP W-117. This project is to design, permit and construct a new 1,400' long, 8" water line from near the intersection of SE 9th Street and 168th Place, through Weowna Park and connect to the existing fire hydrant near the dead-end line in 170th Place SE. The line will be constructed in SE 9th Street within existing right-of-way, through Weowna Park in an existing dirt driveway/trail, through two private driveways, and in 170th Place SE within existing right-of-way.
July 14, 2022: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.