10825 SE Lake Rd

Sept. 16, 2021: Backyard Landscape. ***EA 21-119288 The work within the shoreline area is removing an old fire-pit, a concrete pad, concrete steps. Adding stone benches for a fire-pit area and stone steps to replace the concrete steps. A portion of the area that used to be a concrete pad will be replaced with permeable pavers., 1018209

Sept. 1, 2022: Completed.