Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

9810 SE Shoreland Dr

Dec. 16, 2021: Hormel Shoreline Improvements. Unpermitted work occurred within the Lake Washington shoreline setback on the property in 2018, resulting in minor modifications to hardscape and landscape areas within the setback. The pre-existing condition included a wood bulkhead at the ordinary high water mark, concrete stairs and retaining walls, and areas of planting. Improvements carried out in 2018 included relocation of the stairs, reconfiguration of a walkway, bulkhead removal, the construction of multiple retaining walls, and the addition of plantings and artificial turf. As part of retroactively permitting these actions, the artificial turf is proposed to be removed and replaced with plantings. All other improvements will remain., 20-105372-BR

Sept. 29, 2022: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.