13831 NE Bellevue-Redmond Rd

Dec. 23, 2021: Early World Childrens School Bridge Repair. The existing lower wooden bridge on-site, which provides vehicular access from NE Bel-Red
Road to the Early World Children's School, has deteriorated to a point that it is no longer usable.
The bridge spans Kelsey Creek, a Type F stream. The bridge is proposed for repair in
the same location. The footprint of the bridge will not increase, though multiple pin piles will be placed within the stream to support the repaired bridge. Mitigation plantings are proposed to compensate for impacts associated with the repaired bridge.

April 6, 2023: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.