5205 Lakehurst Ln
Jan. 7, 2022: Follett Pier. We propose to remove (11) existing piles, repair (7) existing piles, drive (11) 8" piles, drive (1) 8" brace pile, rebuild the current dock with grated decking material, drive (2) 10" mooring piles, removing a part of the dock section, remove (1) dock mounted jetski lift, add (1) dual jet ski lift, and reconfigure the existing finger.
Permits issued.
View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Download design proposal PDF.
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.