Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

875 Shoreland Dr SE

Jan. 14, 2022: Sharp Pier. REPLACE AN EXISTING PIER WITH A NEW PIER CONFIGURATION. REPLACE A BOAT COVER WITH A NEW COVER CONFIGURATION. REMOVE AN EXISTING FLOAT PLANE LIFT. INSTALL A NEW BOAT LIFT, PLATFORM LIFT, AND DOUBLE JET-SKI LIFT. REPAIR A 7 LINEAL FOOT SECTION OF ROCK BULKHEAD.

March 16, 2023: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.