Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

Jan. 28, 2022: COBT 120th Avenue NE (Stage 4) - NE 16th Street to Northup Way Multimodal Corrid. This project will widen 120th Avenue NE between NE 16th Street and Northup Way from a two-lane roadway to include a center lane that may be channelized as a left-turn lane, a two-way left-turn lane, or a median/center island. The two southbound through lanes will be extended from the southern project termini to NE 18th Street. The project will add new bicycle lanes and sidewalks or a shared-use path, as well as provide illumination, traffic signal system, intelligent transportation systems, channelization, signing, irrigation, and landscaping. This project will install stormwater drainage, flow control and water quality facilities, and realign and improve an existing culvert with a new fish and wildlife passable structure. Construction of this project may be phased.

May 9, 2023: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.