Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

1235 96th Ave SE

March 22, 2022: Toubou Za, LLC dock replacement. Replace existing non-conforming dock with conforming dock on Lake Washington. Replacement dock to be ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Replacement piles (14) to be 6" diameter galvanized steel. Replacement decking to be ThruFlow grated panels. Three 8" diameter moorage piles to be installed as shown on attached plans. Existing over water coverage to be increased from 164 to 480 SF.

April 20, 2023: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.