9109 Lake Washington Blvd NE

March 30, 2022: Reingold pier repair. Repair east pier. Repair piles as needed by sleeving with HDPE pipe and filling with concrete. Repair caps and stringers as needed. Add intermediate stringers to support the grated decking. Replace the existing solid wood-plank decking (1,074 SF) with Thru-Flow grated decking (43% open space). No work to west pier.

June 22, 2022: Completed.