9103 Lake Washington Blvd NE

March 30, 2022: Piacere, LLC pier repair. Repair piles as needed by sleeving with HDPE pipe and filling with concrete. Repair caps and stringers as needed. Replace the existing solid wood-plank decking (568 SF) with Thru-Flow grated decking (43% open space). Add intermediate stringers to support the grated decking.

June 22, 2022: Completed.