9103 Lake Washington Blvd NE
March 30, 2022: Piacere, LLC pier repair. Repair piles as needed by sleeving with HDPE pipe and filling with concrete. Repair caps and stringers as needed. Replace the existing solid wood-plank decking (568 SF) with Thru-Flow grated decking (43% open space). Add intermediate stringers to support the grated decking.
June 22, 2022: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.