1020 W Lake Sammamish Pkwy SE
April 12, 2022: Hawk dock repair. Project is to replace worn elements on existing residential dock on Lake Sammamish. Over water decking to be replaced with ThruFlow grated panels. Dock framing to be replaced in kind/same location with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Piles to be sleeved if/as needed with HDPE tubes. All work to be done in existing dock footprint.
Oct. 19, 2022: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.