9624 SE Shoreland Dr

July 6, 2022: Sodergren dock repair work. Conduct maintenance/repair work on existing residential dock on Lake Washington. Dock framing to be replaced with ACZA treated fir beams - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Piles to be sleeved if/as needed with HDPE tubes as shown on attached plans. All work to be done in existing dock footprint.

Sept. 8, 2022: Completed.