Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

4803 122nd Ave SE

July 22, 2022: 4803 122nd Ave SE Vegetation Restoration. Two Douglas-fir trees were removed on 4803 122nd Ave SE in Bellevue, Washington without permit. Critical area land use permit is needed for the restoration of vegetation for this site. The goal of the restoration plan is to replace the removed trees as well as provide compensation for the temporal loss of removing the trees, and stabilize soils near the steep slope. The restoration plantings will reduce erosion potential and decrease invasive and non-native plant cover without harming steep slope areas.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.