Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

2177 Killarney Way

Oct. 17, 2022: Anderson dock reconfiguration. Reconfigure existing residential dock on Lake Washington. Existing boathouse to be removed and two 12" diameter epoxy coated steel moorage piles to be installed. Replacement and new dock framing to be ACZA treated fir -stringers to be 4" x 8", joists/pile caps to be 6" x 8". Replacement and new decking to be ThruFlow grated panels. Over water square footage to be reduced from 1086 to 1082 SF. Remaining piles (4) to be sleeved with HDPE tubes as shown in sleeving detail. New pier piles (21) to be 6" diameter epoxy coated steel.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.