Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

2634 W Lake Sammamish Pkwy SE

Oct. 18, 2022: Mathur Dock Repair Maintenance. Replace worn elements on existing residential dock on Lake Sammamish. Dock framing to be replaced with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Piles to be sleeved with HDPE tubes as shown on attached plans. Float to be replaced if/as needed with vinyl encased tubs. All work to be done in existing dock footprint.

April 11, 2023: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.