1200 W Lake Sammamish Pkwy SE
Dec. 19, 2022: Tector dock repair work. Replace worn elements on existing residential dock on Lake Sammamish. Dock framing to be replaced with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking to be replaced with ThruFlow grated panels. Piles to be sleeved with HDPE tubes as shown on attached plans. All work to be done in existing dock footprint.
April 11, 2023: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.