102 Cascade Ky

Feb. 1, 2024: Selman Pier. Reconfigure an existing pier. Install two new boat lifts and a platform lift. Install a beach cove. Place 25 cubic yards of spawning gravel in the beach cove. Install a 330 square foot flagstone and concrete pathway. Remove an existing redwood tree. Plant native vegetation per the planting plan.

Feb. 1, 2024: Permits issued.

View full design proposal: