Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

10812 Main St

Dec. 29, 2023: COBT South Downtown Bellevue Arterial Overlay. The project will be doing a grind and overlay at the following locations:
1. Main St from 100th Ave to 116th Ave
2. NE 2nd St from 108th Ave to 112th Ave
3. 110th Ave NE from Main St to NE 2nd St
4. 112th Ave NE from Main St to NE 2nd St

The project will evaluate sidewalk, curb, and gutter that are within the project limits and replace if necessary. Curb ramps within the project limits will also be evaluated and upgraded as ADA compliant curb ramps if necessary. Traffic signal induction loops will be removed during the grind process and replaced following the overlay operations. Accessible Pedestrian Signal (APS) pushbuttons will be installed at existing signalized intersections where the curb ramps are being updated to be ADA compliant.

Aug. 25, 2025: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.