1450 114th Ave SE

Jan. 29, 2024: COBU - Bellefield Siphon Replacement - Geotechnical. The proposed project includes geotechnical explorations needed to identify soil conditions and install groundwater monitoring wells at 2 proposed locations for the proposed Bellefield Siphon Replacement Project. The Bellefield Siphon Project includes the replacement of the existing inverted siphon as the primary used conveyance pipe.

Proposed work includes 2 geotechnical explorations to aid design of the proposed Bellefield Siphon Replacement Project. There would be a total of 2 borings located at: (1) the west side of the Mercer Slough West, and (2) the east side of the Mercer Slough West. Each boring will be advanced, using a track-mounted Mobile B-57 drill rig and mud-rotary drilling methods, to a depth of 50 feet. Soil samples will be obtained in conjunction with standard penetration tests at 2.5-foot intervals in the upper 20 feet and at 5-foot intervals thereafter. Each boring will include a work area of about 1,000 square feet and include an observation well for measuring groundwater depths.

Feb. 9, 2024: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.