2 Enatai Dr

Feb. 2, 2024: 2 Enatai Sewer Cleanup Installation. The City of Bellevue Utilities (City) is proposing a project to install structures to allow for cleaning out the Lake Line sewer, an 8-inch cast iron sewer installed in 1965 that runs along the east shoreline of Lake Washington. Currently, the City does not have an effective way to clean out the Lake Line sewer. The installation of land-based cleanouts will allow the City to clean the Lake Line in each direction. Cleanouts are required to properly maintain the sewer system and reduce the chance of overflows into Lake Washington.

Oct. 10, 2024: Permits issued.

View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Download design proposal PDF.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.