May 10, 2024: Olympic PIpeline 20AR UTWM ILI Dig Site 23-14. Cut the pavement and excavate to the 20-inch petroleum pipeline within the city ROW; inspect the pipeline at an in-line inspection tool anomaly location; repair pipeline if necessary; backfill the excavation; restore the pavement.