Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

9406 SE Shoreland Dr

Aug. 5, 2024: Garg dock repair work. Conduct periodic maintenance/repair work on existing residential dock on Lake Washington. Dock framing to be replaced with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking on pier and plane lift to be replaced with grated/light permeable decking. Piles to be sleeved with HPDE tubes as shown on attached plans. All work to be done in existing footprints.

March 20, 2025: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.