9406 SE Shoreland Dr
Aug. 5, 2024: Garg dock repair work. Conduct periodic maintenance/repair work on existing residential dock on Lake Washington. Dock framing to be replaced with ACZA treated fir - stringers to be 4" x 8", joists/pile caps to be 6" x 8". Wooden decking on pier and plane lift to be replaced with grated/light permeable decking. Piles to be sleeved with HPDE tubes as shown on attached plans. All work to be done in existing footprints.
March 20, 2025: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.