109 168th Ave NE
Sept. 3, 2024: COBU North Sammamish Conveyance Project. The project will reduce erosion in a stormwater drainage channel (the Tributary Channel) by connecting an existing 18-inch stormwater outfall to a 12-inch stormwater pipe laid on top of imported fill in the channel. The channel will also be regraded to reduce potential sedimentation from steep slopes and allow for easier maintenance access. The proposed changes to the stormwater system are considered an expanded use of an existing stormwater facility., 24 105167 DC
March 10, 2025: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.