708 Shoreland Dr SE

Oct. 17, 2024: Vowels pier reconfiguration. Reconfigure existing 1,734 SF pier. Remove twenty (20) piles. Sleeve twenty-eight (28) piles with HDPE pipe and fill with conc. Remove the lowered platform (243.5 SF). Shorten the pier by eleven (11) feet. Add three (3) 6-inch epoxy coated steel piles. Reduce the pier size by 600 SF to 1,134 SF. Remove the two (2) pier mounted PWC lifts. Install a freestanding platform lift (233 SF). Replace the existing solid wood-plank decking (1,134 SF) with Titan grated decking (47% open space). Repair caps & stringers as needed. Add intermediate stringers to support the grated decking.

July 10, 2025: Permits issued.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.